BW TYR

BW TYR

AGILE AND ROBUST

Ideally suited to unlock field potential or produce at smaller fields, BW TYR FPSO is designed to perform in the most demanding operational conditions. Providing the benefits of advanced technology without the cost of a bespoke solution, BW Offshore works in collaboration with clients to ensure optimal offshore production.

FPSO DESIGNED FOR HARSH ENVIRONMENT
Hull and topside design to meet the demanding conditions in the North Sea


BRINGING TOGETHER INDUSTRY LEADERS IN HULL, TOPSIDE AND FPSO DESIGN
Joining BW Offhore’s expertise in FPSO operations and project execution with Aibel’s expertise in plant design, fabrication and integration and Vard’s expertise in ship design and construction

STRONG FOCUS ON HSE AND WORKING ENVIRONMENT
Designed to meet the strict requirements on the Norwegian Continental Shelf

OPTIMIZED FOR MARGINAL FIELDS
Flexible and agile to unlock the potential of marginal fields

BW OFFSHORE TMS DESIGN
The turret mooring system is designed for harsh environment and it decouples the FPSO Schedule from the Offshore
installation schedule thus greatly reducing execution risks


Nameplate Rating - Topside
Well Fluids 40,000 bbls/d
Produced Water 36,000 bblsw/d
Produced Gas 40 MMscfd
Gas Export 40 MMscfd
Gas Injection / Gas Lift  40 MMscfd
Water Injection 50,000 bblsw/d
Water Injection Pressure 200 barg
Topside Weight (max) 10,000 tonnes

 

Hull Design
Design Life 25 years
Hull Type Double Hull
Storage capacity 325,000 bbls
Length Overall 178.00m
Breadth (moulded) 36.00m
Depth (moulded) 22.00m
Scantling Draught (moulded)  15.20m
Mooring Turret (3x4 lines)